Hi Experts,
We are goin to setup Installation of temporary 3-Tier SMP2.3, WM6.0 and IM3.2 system landscape.
Setting up of DEV, QAS and PRD environment (for SMP2.3, WM6.0 and IM3.2) for users (augmenting from 10 to approx 100 end users in Q2 2015)
As a basis point of view(basis consultant),can y0u provide me with some guide/steps for below queries.- (also,suggest what more roles needs to be performed as a basis consultant-New to this scenerio)
Install R/3 plug-in on PPC ECC system (D, Q, P)
Details-SAP backend system-ECC-6 EHP5
SAP front end system-Sapnetweaver 7.3 EHP1
Establish connections between SMP and ECC
Details-Any possible guide/suggestion
Mobile Application -SAP Work Manager 6.0 and IM3.2
NOTES REFERED-(1936034 - SAP Work Manager ABAP AddOn Installation Master Note )
kind Regards,Sumit